市南排河渔港码头工程设计梁板式高桩码头结构 下载本文

内容发布更新时间 : 2024/5/23 15:49:35星期一 下面是文章的全部内容请认真阅读。

XX市南排河渔港码头工程设计

梁板式高桩码头结构

Fishing port design of Nan pai river in Huang hua

Beam-and-slab High-pile Structure

摘 要

XX市南排河渔港位于河北省东部,渤海湾西岸,XX市以东30km处,是河北省群众渔业的国家一级渔港,渔港码头岸线达923.20米。本文设计的是XX市南排河卸渔码头,码头总长212m,宽18.5m,结构为梁板式高桩码头,纵横梁搭在桩帽上。采用轨距10.5m门机起重机进行装卸作业。主要对面板,纵梁和横向排架进行了计算。以四边与纵横梁相连的双向板为例进行内力计算与配筋,纵梁部分施工期按简支梁计算,使用期按刚性连续梁计算。横梁按弹性支承连续梁进行内力计算。

关键词:高桩码头;双向板;弹性支承连续梁;桩端承载力

ABSTRACT

located in He bei province,the east of Bohai Bay, is the national level of hebei people fishing port. The coastline is 923.20Primary lateral and longitudinal of panel, bent. With the rectangle beam with and linked to two-way plate as internal force calculation and reinforcement, longitudinal beam calculation, construction parts according to the continuous girder by rigid system. According to the elastic beam supporting continuous beams.

KEY WORDS:high-piled wharf; two-way slab; Elastic support beam; Pile bearing capacity