relationship, established equivalent relationship 14, and subjeon problem (4)--scores and percentage application problem review content overview answers scores, and percentage application problem of key is: according to meaning, (1) determine standard volume (units \hen in-line solution. Category fraction multiplication word problem score Division applications engineering problem problem XV, a subject: review of the measurement of the amount of capacity, measurement and units of measurement of comnt and their significance in rate 1, currency, length, area, volume, unit size, volume, weight and rate. (Omitted) 2, commonly used time units and their relationships. (Slightly) with a measurement units Zhijian of of poly 1, and of method 2, and poly method 3, and of method and poly method of relationship measurement distance of method 1, and tool measurement 2, and estimates 16, and subject: geometry preliminary knowledge (1)--line and angle review content line, and segment, and Ray, and vertical, and parallel, and anglct: applicatie angle of classification (slightly) 17, and subject: geometry preliminary knowledge (2)--plane graphics review content triangle, and edges shaped, and round, and fan axisymmetric graphics perimeter and area combination graphics of area subject : Preliminary knowledge (3)-review of solid content category 1-d shapes are divided into: cylinder and cone 2, column is divided into: cuboid, square 3, cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and vmon units of measuremeolume 1, size 2, table ...和公路工程施工监理用表填写及管理说明

一、填写说明

1、公路工程用表分为两大类:施工用表、监理用表。

施工用表包括:A表、C-1表、C-2表、E表、C-3表、D表、工程计量报表、工程变更报表;

监理用表包括:B表、旁站表、C-2表、C-3表、D表。 其中:

(1)A表----指施工管理用表(原监理手册中的A表和F-1表); (2)B表----指监理管理用表(原监理手册中的B表和F-2表); (3)C-1表----指现场质量检验报告单; (4)C-2表----指检验记录表; (5)C-3表----指工程质量检验评定表; (6)E表----指施工原始记录表;

(7)旁站表----指监理旁站记录表(原监理手册中的E表),公路土建工程使用此次新编制的《监理旁站手册》(另册)中所列表格;

(8)D表----使用我省公路工程现行试验检测软件系统内的一套试验检测表格,本次未修订;

(9)工程计量报表----使用我省各建设单位下发的工程计量报表,本次未修订统一;

(10)工程变更报表----使用省交通运输厅《关于印发甘肃省交通运输厅公路工程设计变更管理办法的通知》(甘交建【2003】1号)文件中规定的表格。

relationship, established equivalent relationship 14, and subjeon problem (4)--scores and percentage application problem review content overview answers scores, and percentage application problem of key is: according to meaning, (1) determine standard volume (units \hen in-line solution. Category fraction multiplication word problem score Division applications engineering problem problem XV, a subject: review of the measurement of the amount of capacity, measurement and units of measurement of comnt and their significance in rate 1, currency, length, area, volume, unit size, volume, weight and rate. (Omitted) 2, commonly used time units and their relationships. (Slightly) with a measurement units Zhijian of of poly 1, and of method 2, and poly method 3, and of method and poly method of relationship measurement distance of method 1, and tool measurement 2, and estimates 16, and subject: geometry preliminary knowledge (1)--line and angle review content line, and segment, and Ray, and vertical, and parallel, and anglct: applicatie angle of classification (slightly) 17, and subject: geometry preliminary knowledge (2)--plane graphics review content triangle, and edges shaped, and round, and fan axisymmetric graphics perimeter and area combination graphics of area subject : Preliminary knowledge (3)-review of solid content category 1-d shapes are divided into: cylinder and cone 2, column is divided into: cuboid, square 3, cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and vmon units of measuremeolume 1, size 2, table ...和2、主要表格的填写:

(1)A表----由施工单位填报,监理工程师审核、审批。 (2)B表----由监理人员填写。

(3)C-1表----由施工单位填报,专业监理工程师审核签认,将抽检结果填入“监理意见栏”中。

(4)C-2表----是C-1表的附表。

(5)C-3表----用于施工单位和监理单位进行质量评定。

(6)E表----由施工单位填报,涉及旁站工序的由旁站监理人员签认。

(7)旁站表----由现场旁站监理人员填写,专业监理工程师或驻地监理工程师审核。

3、工序资料与分项工程交工资料填报构成形式: (1)施工单位自检工序填报表格构成形式: 现场质量检验报告单(C-1表)

现场检验记录表(C-2表)(与C-1表中检验项目相对应的C-2表) 施工原始记录表(E表)(如果有)

试验检测结果报告单(如果有)(例如:砼强度报告单、承载力检测报告等)

(2)分项工程中间交工资料 分项工程交工证书(A-13表)

分项工程评定表(C-3-1表)(承包人自检评定) 检查记录表 (C-3-12表)

relationship, established equivalent relationship 14, and subjeon problem (4)--scores and percentage application problem review content overview answers scores, and percentage application problem of key is: according to meaning, (1) determine standard volume (units \hen in-line solution. Category fraction multiplication word problem score Division applications engineering problem problem XV, a subject: review of the measurement of the amount of capacity, measurement and units of measurement of comnt and their significance in rate 1, currency, length, area, volume, unit size, volume, weight and rate. (Omitted) 2, commonly used time units and their relationships. (Slightly) with a measurement units Zhijian of of poly 1, and of method 2, and poly method 3, and of method and poly method of relationship measurement distance of method 1, and tool measurement 2, and estimates 16, and subject: geometry preliminary knowledge (1)--line and angle review content line, and segment, and Ray, and vertical, and parallel, and anglct: applicatie angle of classification (slightly) 17, and subject: geometry preliminary knowledge (2)--plane graphics review content triangle, and edges shaped, and round, and fan axisymmetric graphics perimeter and area combination graphics of area subject : Preliminary knowledge (3)-review of solid content category 1-d shapes are divided into: cylinder and cone 2, column is divided into: cuboid, square 3, cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and vmon units of measuremeolume 1, size 2, table ...和 分项工程评定附表(C-3-6~C-3-11)(如果有)

4、每道工序(或分项工程)完工后,由承包人填报工序检验资料,监理人员根据规范规定的抽检频率(不低于施工单位自检频率的20%)进行检验后,按程序进行签认。监理对签认结果及签认资料的真实性负责,不再独立填写一套工序抽检资料。

5、分项工程评定强调了对《公路工程质量检验评定标准》中基本要求的检查,不具备条件不能进行评定。分项工程评定由监理人员根据抽检结果独立评定。在进行分项工程质量评定时,如果监理检测的数据频率不能满足评定需要时,可使用监理签认过的检验数据作为补充。

6、一个监理机构只记录一本监理日志,监理日志由监理机构驻地(或副驻地)监理工程师记录,监理巡视与旁站记录由监理人员填写(即每位现场监理人员都要填写巡视记录,旁站记录由旁站的监理人员填写)。

7、《监理指令》的签发权限只归属于驻地监理工程师(或总监理工程师);现场专业监理工程师根据工作需要及问题重要程度,在被授权范围内可签发《监理工程师通知》。

8、在工程计量时必须提供《分项工程交工证书》,对路基土方与混凝土工程的计量,建设单位可作为特例在专门制定计量方面的管理办法时单独进行说明。

9、监理工程师用表(B表)与承包人用表(A表)中涉及的程序管理表格,在施工单位负责人或驻地监理工程师签字后,均应加盖单位(或机构)公章。

10、在工序资料填报时因砼强度不到28天时间的问题,在“检验结果”