球罐整体热处理作业安全风险分析(JSA) 下载本文

内容发布更新时间 : 2024/6/8 21:54:39星期一 下面是文章的全部内容请认真阅读。

LPG STORAGE AND TERMINAL FACILITY AT HAMBANTOTA General Notes: 1. This JSA must be discussed with all involved personnel prior to job execution. Pre-job planning and daily toolbox meeting should be held on site prior to starting daily work to discuss relevant issues, technical procedures and assignment during job execution. 2. Incorporate daily toolbox meeting to consider safety requirements for each task assignment before commencing job. 3. Ensure that personnel that are handing heavy equipment are certified and the equipment is tested, maintained and cover with necessary certificates and approved plant access. 4. Workers shall be required to wear appropriate minimum PPEs e.g. safety goggles, safety helmet, safety shoes, and flame resistant clothing. 5. In case of emergency, inform the HSE manager Mr. Wang 0094-778505651 Document No. HQSM07-00-HSE-JDJSA-005 SL # SEQUENCE OF BASIC JOB STEPS POTENTIAL HAZARDS REQUIRED HAZARDS CONTROL 01 ? 焊接钢筋带 ? Steel welding ? 高空坠落fall from height ? 高空坠物 objects fall from height ? 物体打击 object strike ? 进行焊接钢筋带作业者,正确佩戴好劳保防护用品方可作业。 ? Wear protective appliances before welding operation ? 每个作业者在作业时候,相互了解、告知。 Each operator entering into operation notify and get to know each other’s exsitence . Page 1 of 5

02 ? 包保温棉 ? Temperature keeper ? 高空坠落fall from height ? 高空坠物 objects fall from height ? 物体打击 object strike 03 ? 接热电偶线、通信线、电源线 ? Thermocouple wire , communication line , power line ? ? ? ? 高空坠落fall from height 高空坠物 objects fall from height 物体打击 object strike 触电 electricity shock ? ? 每个人觉得不适应之前可以随时停止工作并离开作业区域。 ? Each personne can stop working and leave operational space before feeling uncomfortable ? ? 进行焊接钢筋带作业者,正确佩戴好劳保防护用品方可作业。 ? Wear protective appliances before welding operation ? 每个作业者在作业时候,相互了解、告知。 Each operator entering into operation notify and get to know each other’s exsitence . ? ? 每个人觉得不适应之前可以随时停止工作并离开作业区域。 ? Each personne can stop working and leave operational space before feeling uncomfortable ? ? 进行焊接钢筋带作业者,正确佩戴好劳保防护用品方可作业。 ? Wear protective appliances before welding operation ? ? 每个作业者在作业时候,相互了解、告知。 Each operator entering into operation Page 2 of 5

04 ? 试点火、热处理点火 ? Trial lighting , heat treatment lighting ? ? ? ? 高空坠落fall from height 高空坠物 objects fall from height 柴油外喷lethal leaking 火灾 fire 05 ? 拆除电源线、通信线、热电偶线、热处? 高空坠落 fall from height ? 物体打击 object strike ? 高空坠物 objects fall from height Page 3 of 5

notify and get to know each other’s exsitence . ? ? 每个人觉得不适应之前可以随时停止工作并离开作业区域。 ? Each personne can stop working and leave operational space before feeling uncomfortable ? ? 所有接线作业全部在断电下进行。 ? All ground lead operation should be carried out without any electricity ? 在球罐下人孔处搭设脚手架把喷嘴固定在脚手架里面。 ? Build scafold in the man hole of spherical tank to stablize spray inside scafold ? 各个油路处认真仔细维护、检查、整改,确保万无一失。 ? Carfully check , repair and correct all gas line to make sure everthing goes correctly ? 配备灭火器、保温棉,油路小组在喷嘴点火开始时不间断的巡检。 ? Prepare fire distinguisher , temperature keeper , gas team for trial lighting , continuosly check form time to time . ? 进行拆除保温棉作业者必须正确佩戴好劳保防护用品方可进入。 理保温棉 ? Disassembly of Thermocouple wire , communication line , power line , heat treatment temperature keeper ? ? 触电 electricity shock ? Wear protective appliances before disassembly operation ? ? 每个作业者在作业时候,相互了解、告知。 Each operator entering into operation notify and get to know each other’s exsitence . ? ? 每个人觉得不适应之前可以随时停止工作并离开作业区域。 ? Each personne can stop working and leave operational space before feeling uncomfortable ? ? 所有接线作业全部在断电下进行。 ? All ground lead operation should be carried out without any electricity

Unloading for goods and materials: 球罐整体热处理 Work Location: (LPG罐区) Prepared by: (Sub -contractor) 初强 Reviewed by: (Contractor)王卓辉 Approved by: (Client)

Page 4 of 5