SAP成本计算doc资料 下载本文

内容发布更新时间 : 2024/5/14 17:57:57星期一 下面是文章的全部内容请认真阅读。

4) Qty Structure Control

6:10 | 添加评论 | 固定链接 | 写入日志 | SAP FICO Subcontracting Costing Configuration

1. Sub-contracting is a special procurement, which is defined as F+30 in the material master.

1) The special procurement type is defined in the IMG

Special procurement type mainly includes: subcontracting, consignment, stock transfer etc

Below is the special procurement type 30

2. Specify that a material is sub-contracting material (special procurement type is 30), TCode MM01

Please note that R-B100 is a semi-finished product, it should have BOM.

3.Define valuation method for sub-contracting(using OKKN). Valuation method is defined in costing variant. Below is the configuration of costing variant PPC1

4. Use Tcode ME11 to define info record. Condition PB00.

5. Use CK11N to run the standard costing and review the result.

View the pricing strategy

1) Change the layout to contain price strategy. It can be found that price strategy is 3.

2) View the configuration for costing variant PPC1, 3 stands for net quotation price.

3:20 | 添加评论 | 固定链接 | 写入日志 | SAP FICO