阳极氧化工艺流程翻译 下载本文

内容发布更新时间 : 2024/5/3 10:26:26星期一 下面是文章的全部内容请认真阅读。

阳极氧化工艺流程翻译

Process flow and raw materials of aluminum and

aluminum alloy anodic oxidation tinting

Procedure specification on aluminum and aluminum alloy anodic oxidation tinting

1. Procedure specification(line drawing)

Substrate → Mounted hanging → Degreasing → Alkaline etching oxidation

Neutralization

coloring

Anodic

→ Electrolytic → Sealing →

Electrophoretic coating → Curing → Unloading packaging → Warehousing

2. Mounted hanging:

2.1 preparations before mounted hanging. 2.1.1 Check the conductive parts like conductive beams and bars. They should be regularly polished, cleaned or repaired.

2.1.2 Get ready conductivity of aluminum and aluminum wire.

2.1.3 Check the pneumatic tools and related equipment.

2.1.4 Check whether or not requirements like length, count, color, thickness on the flow paper or production task list are consistent with the order drawing and actual materials.

2.1.5 Depending on the specifications (size of

circumscribed circle, external surface area, etc.) to determine the count and space. To control the pigment spacing about 1.2 times than the horizontal width of the material shaped, and the white material spacing about 1 time than the width.

2.1.6 Choose the appropriate rack, and ensure that hook number of negative and positive hangers is the same with the count of materials shaped.

2.2 Mounted hanging:

2.2.1 When hanging, fix the topside one first, and then the bottom one, and then arrange the remaining sections in the middle, and tighten the screws.

2.2.2 Before hanging, placing one aluminum sheet between the material and aluminum screw p so that it can prevent poor conductivity impacting

oxidation,

coloring

and

electrophoresis.

2.2.3 When hanging, it is not allowed to hang all the materials in the lower or upper rack.