Drilling-COSL 钻井事业部“三基”工作手册 钻井常用英汉对照表

打捞工具和常用词语 spear side wall core casing scraper mill die stamp pin tap box tap packer opener junck sub fishing over shot cutter blades pony D.C pup joint slick M.D.C fishing neck perforate no accident HRS on swivel below jar W.T HRS on jar seal assembly total mud cost centrifugal pump brine sub sea camera core barrel travelly block Draw works port annular prevent 打捞矛 井壁取芯 套管清刮器 磨鞋 铅印 公锥 母锥 封隔器 扩眼器 打捞杯 打捞筒 割刀 刀臂 短钻鋌 短钻杆 光滑防磁钻鋌 打捞短节 射孔 无事故 水龙头时间 震击器以下重量 震击器时间 密封总成 泥浆总消耗量 灌注泵 饱和盐 水下电视 岩芯筒 游车 钻井绞车 左舷 万能防喷器 back pressure drill out cement explosive squeeze cement fast line spooler shallow gas panels bridge plug 回压 钻水泥塞 炸药 挤水泥 快绳排绳器 浅层气 面板 桥塞 well kick and 50BBLs pits 井涌增量50桶 gain kelly guard blow out guideline guide rail pick up weight sluck off weight rotating weight max torque rotating HRS total BHA length check crown o matic total BHA weight 方钻杆保护接头 井喷 导向绳 导轨 上提重量 下放重量 总重量 最大扭矩 纯钻井时间 总BHA长度 检查防碰天车 总BHA重量 held safety meeting on rig 钻台举行安全floor 会 wear bushing bridge crane of the BOP liner Wash pipe packing sand traps compensator crown block stabilizer starboard choke/kill line 抗磨补芯 BOP叉车 尾管 冲管盘根 沉沙池 补偿器 天车 扶正器 右舷 阻流和压井管线 第 1 页 共 6 页

Drilling-COSL 钻井事业部“三基”工作手册 钻井常用英汉对照表

shear ram trip tank plug back nozzle boost line marine swivel prepare break CIRC degasser desander shale shaker gas cut mud open hole tubing testing plugged bit well off set recover survey rig heading wind speed roll visible 剪切闸板 计量罐 打水泥塞 水眼 加速管线 水下水龙头 准备 短时循环 除气器 除沙器 震动筛 气侵泥浆 裸眼 油管 测试 泥包钻头 井口位移 回收测斜仪 平台首向后 风速 横摇 能见度 choke manifold gas peak dart sub jetter core point trip gas after effect mud cleaner desilter prior/before helicopter special tool No.4 guide line brocken fix caving D.c twist off tugger pitch sweel wave heave dir 阻流管汇 气测值 投入式止回阀 喷射冲洗器 取芯点 后效气 后效 泥浆清洁器 除泥器 在——之前 直升飞机 特殊工具 四号导向绳断掉 修理 垮塌 钻鋌折断 气动绞车 纵摇 涌 浪 升沉 方位 钻井常用短语 Last anchor on rack at 0600HR Start of contract at 1530HR End of contract at 0300HR Rig on tow Rig arrived well location at 1000HR Run anchors and first anchor on bottom at 1100HR Ballast rig to 70ft draft deballast rig 六点最后一个锚上架 下午三点半合同开始 早上三点合同结束 平台拖航 早上十点到达井位 抛锚。第一个锚11点到底 压载到70英尺 平台卸载 adjust well location with pull No .1 and No.2 anchors 拉1和2号锚调整井位 gain anchor tension test No.3 and No4-ok wait slack tide replace upper felly cock 1和2号锚张力试验-OK 等待平潮 替换方钻杆上阀 第 2 页 共 6 页

Drilling-COSL 钻井事业部“三基”工作手册 钻井常用英汉对照表

spuded time arrived time 开钻时间 到达井位时间 drill 36\钻36\井眼从120米至200米,每接each connection and ream each connection once 一拄前滑眼一次并泵入50桶泥浆 open 17-1/2\ leak off test at 500m.MW 1.2SG leak off @625psi ream hole from 450m to 500m core drill from 1300m to 1320m collect/remove core and service core equipment sweep hole with 100bbl HI-VIS mud slug the hole with viscous mud pump 6000stks HI-VIS mud circulate and working on pipe circulate and wash from 100m to 200m circulate bottom up circulate for sample flow check at 2300m due to drilling break circulate for flow check circulate and condition mud reverse circulate pooh no rotary and no drag run in W/26\ RIH to wipe trip RIH to tag top of cement at 1000m short trip over pull 50klbs make up new bottom hole assy drop survey pump slug and POOH retrieve/return survey inside BOP drill at casing shoe 用17-1/2\钻头扩眼从250米至500米 破裂试验.井深500米、泥浆比重1.2SG.泄漏压力为625PSI 倒划眼从450米至500米 取芯钻进从1300米至1320米 收集/甩下岩芯并包装处理 用100桶高粘泥浆清洗井 泵送一段稠泥浆进井 泵6000冲高沾泥浆 循环并活动钻杆 循环清洗100米至200井段 循环井底出来 循环取样 流量观察因钻至2300米时突变 循环观察 循环处理泥浆 反循环 起钻不用转盆也不拖挂 下26\领眼钻头和36\扩眼器至117米探海底泥面 下钻通井 下钻探水能面在1000米处 短起过提50千磅 组合新的下部钻具 投测打重泥浆.起钻 回收测斜仪 在套管鞋进行防喷演习 POOH circ & fill annular W/TR.TK.P no good. 起钻灌浆不正常,怀疑是泥浆问题.Suspect mud problems. W/pull out every 5 Stands&fill 每起五柱灌浆-正常 a time ok POOH due to change bit POOH due to plan change POOH for changing bottom hole assy POOH wet pipe and no slug POOH no rotary 第 3 页 共 6 页

因要换钻头所以起钻 计划改变起钻 起钻更换下部钻具组合 起钻喷泥浆因没打重泥浆 起钻不转转盆 POOH due to lost pump pressure suspect washout D.C 泵压下降起钻,怀疑钻鋌刺漏