绪言
陆浑灌区是河南省较大的灌区之一,灌区跨越洛阳,开封、郑州市三个地区的六个县,灌区范围内居住人口大约100万人。陆浑灌区的主要水源是陆浑水库。
许营渡槽定为Ⅲ等3级建筑物,设计流量Q设=40m3/s ,加大流量Qmax=45m3/s。,渡槽总长110m,进口与上游矩形渠道连接,出口与下游梯形浆砌石渠道连接。
Introduction
Luhun irrigated area is Henan province one of the larger area, irrigated area spanning Luoyang, Zhengzhou, Kaifeng, three of the six county region, irrigated area population residing within about 100 million people. The main luhun irrigation water is luhun.
Xu Ying aqueduct as Ⅲ, 3-level building, design flow q set = 40 m 3/s, and increase the flow Qmax = 45 m 3/s. Total length of the aqueduct, import and upstream 110m rectangular channel connection, export and downstream trapezoid shiqu connection.
目录
绪言 Introduction
1 工程概况及基本资料 ........................................................................................................... 1
1.1 工程概况........................................................................................................ 1
1.1.1 灌区基本概况.................................................................................... 1 1.1.2东一干概况........................................................................................... 2 1.2地形地质情况................................................................................................... 2
1.2.1 地形.................................................................................................... 2 1.2.2 地质.................................................................................................... 2 1.3 气象................................................................................................................ 3 2 渡槽选型与布置 .................................................................................................................... 4
2.1 结构型式选择................................................................................................ 4 2.2 总体布置........................................................................................................ 4 2.3 结构布置........................................................................................................ 4 3 水力计算 ................................................................................................................................. 5
3.1 计算依据、公式及参数选择........................................................................ 5 3.3
水面衔接验算. ............................................................................................. 6 3.3.1渡槽总水头损失计算........................................................................... 6 3.3.2渡槽进出口底部高程的确定............................................................... 6 3.3.1进出口渐变段长度的确定................................................................... 7
4 槽身结构计算 ........................................................................................................................ 8
4.1槽身尺寸拟定................................................................................................... 8 4.2荷载与组合....................................................................................................... 9
4.2.1荷载......................................................................................................... 9 4.2.2荷载组合............................................................................................... 10 4.3槽身横向及纵向结构计算............................................................................. 10
4.3.1槽身横向结构计算............................................................................... 10
1
4.3.2 槽身纵向结构计算............................................................................ 16 4.4槽身配筋计算................................................................................................. 17
4.4.1横向结构配筋计算............................................................................... 17 4.4.2纵向结构配筋计算............................................................................... 18 4.5抗裂验算......................................................................................................... 19 4.6挠度验算......................................................................................................... 21 4.7槽身整体稳定性验算..................................................................................... 21 5.排架设计 ............................................................................................................................... 23
5.1排架的布置..................................................................................................... 23 5.2最主要荷载的计算......................................................................................... 25 5.3排架的横向内力计算..................................................................................... 25
5.3.1作用于排架节点上的荷载................................................................... 25 5.3.2排架内力计算....................................................................................... 27 5.4排架的配筋计算............................................................................................. 32 5.5排架的强度和稳定验算................................................................................. 33 6.细部构造 ............................................................................................................................... 34
6.1伸缩缝及止水................................................................................................. 34 6.2支座................................................................................................................. 34 7.工程量计
2
1 工程概况及基本资料
1.1 工程概况
陆浑灌区是河南省较大的灌区之一,灌区跨越洛阳,开封、郑州市三个地区的六个县,灌区范围内居住人口大约100万人。陆浑灌区的主要水源是陆浑水库。
许营渡槽定为Ⅲ等3级建筑物,设计流量Q设=40m3/s ,加大流量Qmax=45m3/s。,渡槽总长110m,进口与上游矩形渠道连接,出口与下游梯形浆砌石渠道连接。
1.1.1 灌区基本概况
陆浑水库位于河南省嵩县境内,它是伊河上的一座大型水库。控制流域面积3750km2,
多年平均径流量10.25亿m3总库容12.17亿m3,兴利库容5.06亿m3,兴利水位317.0m。大坝坝顶高程330m,最大坝高52.0m,溢洪道位于大坝东岸。为加大部分洪库容溢洪道上设有闸门,闸底槛高程313m,闸门顶高程324m,门高11m。溢洪道最大泄水流量为3600s.m3。泄洪洞位于大坝与溢洪道之间,为8×10m的城门洞型明流无压洞,洞长510m,进口底高程289.715m。出口底高程282.35m,最大泄流量11608m3。
整个灌区是由总干渠和东一、东二、西干三条干渠组成的,全长共290.5km,建筑物1134座,其中主要建筑物有隧洞33座,全长23.9km;渡槽32座,全长9.8km;另外还有倒虹吸等输水建筑物。
灌区设计灌溉面积134万亩,总干渠进口设计流量为77.0m3/s,相应水位298.0m,总干渠末端设计流量55.8 m3/s,相应水位290.535m。灌区三条干渠规划成果如表1所示:
表1 陆浑灌区总干、主干渠规划数据表 渠名 项目 渠 长(KM) 45.30 控制面积(万亩) 165.80 规划面积(万亩) 120.04 水库引灌(万亩) 113.58 反调节灌(万亩) 6.46 137.90 85.30 57.61 52.73 4.88 51.80 44.70 27.36 25.78 1.58 55.50 17.50 16.77 16.77 0 总干渠 东一干 东二干 西干区 1
1.1.2东一干概况
东一干渠规划灌溉面积57.61万亩,其中汝阳1.58万亩,伊川3.17万亩,偃师26.47万亩,汞阳4.96万亩。一干渠设计流量考虑近期与远期两种情况,也就是在同一渠段上的建筑物,如渡槽,隧洞等的输水能力按远期规划确定设计流量(譬如东一干进口段上的建筑物设计流量为50 m3/s),以使留有余地。而渠道土石方开挖断面按近期规划确定尺寸,(譬如东一干进口段的渠道设计流量为45 m3/s)。
东一干渠自内埠到已水河的渠段设计长度为137.9km。共有各种建筑物566座,其中隧洞24座,累计长度17km;渡槽21座,累计长度62km,桥234座(包括公路桥41座,生产桥120座,人行桥25座,排洪桥48座),还有退水闸与节制闸32座,涵洞(管)139座,流槽6座,跨渠渡槽26座,支斗渠引水口89座。
东一干全部工程量:土方开挖1455万立方米,回填土方590万立方米,石方开挖308万立方米,砌石54万立方米,混凝土10万立方米,钢筋混凝土3300万立方米。需要净工日(包括民工和技工)2475万个,基本建设投资6180万元。开挖土石方用炸药1257吨,三大材需用量分别为:水泥81800吨,钢材3575吨,木材73000立方米。 1.2地形地质情况
1.2.1 地形
陆浑灌区处于伏牛山北麓,嵩山和熊耳山后谷地一带,地形复杂。东一干渠灌溉区域内多为低山丘陵干旱区,区内岗洼相间,地面覆盖为红色和棕红色粘土及黄土。在龙门以东偃师、巩县的半山区和丘陵区水文地质较差,缺乏地下水源。地表沟壕大部分为南北向,对于排除地面径流与灌渠(区)渗水比较有利,不会产生盐碱化或沼泽化威胁,灌区地形平均坡降为1/100~1/200。
1.2.2 地质
东一干渠规划线路从桩号30+566~31+314.1(位于许营附近),该段是横跨伊河上的一条支流,下面根据河道横断地形,参照河南省水利厅勘探队的钻井资料分段介绍地质情况。
陡坡段长度大约20米,该段为紫红色、红褐色砾岩夹砂质粘土岩,砾岩成分为石英砂岩、石英岩等。粒径一般在5~20cm,最大的达60cm,胶结较差。表面风化严重,凸凹不平,肉眼可见溶蚀的洞穴,直径大小不一,小者1m左右,大的在10m以上,洞
2