Project:
Turkey ICDAS 1×135MW Unit 1
section:
Chemistry
Title:
Waste Water Treatment System
Document number:
TR-ICDAS-CP-CM-002
revision: 1
All rights reserved in this document and the information contained therein. Reproduction, use or disclosure to third party without prior written permission is strictly forbidden
? Heilongjiang Electric Power Research Institute, China.
HEPRI
Signature Page
Document Details
Signatures Revision No. Issue Date: Prepared By: Verified By: Reviewed By: Approved By: Accepted By: 0 2005-05-06 Name Wang zhu Signature Name Shu jiwei Signature Name Jia changge Signature Name Xue ji(CMEC) Gao yunda(HPCC3) Signature Name Osman Celikdemir (ICDAS) Signature 1 2005-06-23 Name Wang zhu Signature Name Shu jiwei Signature Name Jia changge Signature Name Xue ji(CMEC) Gao yunda(HPCC3) Signature Name Osman Celikdemir (ICDAS) Signature
Commissioning Procedure TY-ICDAS-CP-CM-1000
Revision Summary
Rev.0 Initial issue
Rev.1 Revised according to ICDAS’s comments.