西南交通大学本科毕业设计 第IV页

Abstract

The graduation design topic is the construction organization design and budget a hall chengdu. The six on the ground floor, building height of 21.5m, building area of 8059.8m 2, structure of frame structure. This graduation design by hand calculation of engineering quantity, the construction organization design, software calculation software pricing, composed of four parts.

The first part is the calculation of Engineering quantity. Through access to relevant atlas and specification, structural characteristics of comprehensive analysis of construction, selection of construction scheme of basic. According to the construction scheme to calculate the amount of hand list and fixed quantity.

The second part is construction organization design. According to the characteristics of Construction Engineering Division, to determine a reasonable construction sequence, construction method of main parts of the project and the main construction machinery, according to the requirements for the reasonable construction schedule and construction schedule, plan drawing, and to take effective quality, safety guarantee measures, such as safety and civilized construction measures, the winter rainy season construction measures.

The third part software calculation. First look at the application of video teaching self-study software in software on the Internet, then according to the figure and structure of construction project in enterprise reinforced calculation in civil engineering and is the model of.

The fourth part Hongye valuation. Derived from the project in quantity, and then according to the project total amount and units of engineering design drawings and other drawings, through the adjustment of material price (according to the material cost, labor cost, rate coefficient). Finally get

西南交通大学本科毕业设计 第V页

the comprehensive unit price, sub-part of the project quantity price, developed the total cost and unilaterally cost.

Keywords Frame structure;construction project;construction stage;

comprehensive unit price

西南交通大学本科毕业设计 第VI页

目 录

绪论 ............................................................... 1

一、编制内容 ................................................. 1 二、编制依据 ................................................. 1

第1章 1.1

手算工程量与电算工程量对比 ............................... 2 《建设工程工程量清单计价规范》工程量 ........................ 2 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6 1.1.7 1.1.8 1.1.9

1.2

土石方工程 .......................................... 2 砌筑工程 ............................................ 3 混凝工程 ............................................ 3 钢筋工程 ............................................ 7 屋面工程 ........................................... 16 楼地面工程 ......................................... 17 柱墙面工程 ......................................... 18 天棚工程 ........................................... 20 门窗工程 ........................................... 21

《四川省建设工程工程量清单计价定额》工程量 ................. 22 1.2.1 1.2.2 1.2.3 1.2.4 1.1.2 1.1.3 1.1.2 1.1.3 1.1.4

土石方工程 ......................................... 22 砌筑工程 ........................................... 23 混凝土工程 ......................................... 24 钢筋工程 ........................................... 28 屋面工程 ........................................... 36 楼地面工程 ......................................... 37 柱墙面工程 ......................................... 39 天棚工程 ........................................... 40 门窗工程 ........................................... 41

第2章 2.1

施工组织设计 ............................................ 43 工程概况 ................................................... 43

2.1.1

总体说明 ........................................... 43

西南交通大学本科毕业设计 第VII页

2.1.2 2.1.3

2.2

建筑设计 ........................................... 43 结构设计 ........................................... 44

施工组织方案及施工段划分 ................................... 45 2.2.1 2.2.2 2.2.3

施工总程序 ......................................... 45 施工段的划分 ....................................... 45 施工顺序 ........................................... 46

2.3 选择施工方法和施工机械 ..................................... 47 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 2.3.6 2.3.7 2.3.8 2.3.9 2.3.10

钢筋工程 ........................................... 47 模板工程 ........................................... 48 混凝土工程 ......................................... 48 砌体工程 ........................................... 49 屋面工程方案 ....................................... 49 装饰工程方案 ....................................... 50 油漆工程 ........................................... 51 楼地面工程 ......................................... 51 门窗工程 ........................................... 52 施工机械选择 ....................................... 52

2.4 2.5

施工进度计划 ............................................... 52 劳动力等资源量计划 ......................................... 53 2.5.1 2.5.2 2.5.3

劳动力需要量计划表见表2-2。 ....................... 53 主要建筑材料进场计划表见表2-3。 ................... 53 主要机械进场计划表见表2-4。 ....................... 53

2.6 施工部署及施工总平面布置 ................................... 54 2.6.1 2.6.2 2.6.3

施工部署 ........................................... 54 施工准备 ........................................... 54 总平面布置 ......................................... 55

2.7 质量措施 ................................................... 56 2.7.1

模板工程 ........................................... 56

西南交通大学本科毕业设计 第VIII页

2.7.2 2.7.3 2.7.4 2.7.5 2.7.6 2.7.7 2.7.8 2.7.9

2.8

钢筋工程 ........................................... 57 混凝土工程 ......................................... 58 砌体工程 ........................................... 59 块料地面 ........................................... 60 内墙乳胶漆质量控制措施 ............................. 60 塑钢窗质量控制措施 ................................. 61 玻璃幕墙质量控制措施 ............................... 62 冬雨季施工措施 ..................................... 63

工程安全管理措施 ........................................... 64 2.8.1 2.8.2 2.8.3 2.8.4 2.8.5

安全管理目标 ....................................... 64 安全生产管理体系 ................................... 64 安全生产技术措施 ................................... 64 安全事故预防措施 ................................... 67 安全生产管理 ....................................... 68

2.9 文明施工和环境保护措施 ..................................... 69 2.9.1 2.9.2 2.9.3

创建文明工地的目的及意义 ........................... 69 文明施工实施措施 ................................... 69 环境保护措施 ....................................... 72

2.10 保证工程进度的技术措施 ..................................... 74 2.10.1 2.10.2 2.10.3 2.10.4 2.10.5

确保工程进度的主要管理技术措施 ..................... 74 施工总进度计划控制 ................................. 74 保证实现施工总进度计划的措施 ....................... 74 确保工期实施的具体措施 ............................. 75 控制施工工期的奖罚措施 ............................. 76

第3章 3.1

相关软件的应用 .......................................... 77 广联达算量 ................................................. 77

3.1.1 3.1.2

广联达算什么量,如何算量 ........................... 77 广联达软件的算量思路 ............................... 77