generally larger capacity filter capacitance, the transient over-voltage shock absorption of a certain extent, the station Low-voltage transformer side go to feed between the screen using a shielded cable and equipment have a good grounding, the use of modern technology to analyze mine, we must increase the circuit's segregation measures, because its grounding, protection and other electrical grounding all Grounding devices using the same equipment, and equipment are in a LPZOB, the relative strength of strong electromagnetic pulse, the station changed to prevent low-pressure side although there are lines intrusive wave arrester, but the residual pressure high, in the substation of lightning, through the line Coupling and the potential rise caused by over-voltage counterattack still exist, and high-pressure side of the residual pressure as high as several thousand volts, it is necessary to these scheduling automation equipment for the power supply over-voltage circuit protection. Lightning Protection in accordance with the principle of regional division, substation equipment in the secondary power supply system over-voltage sensors lightning protection may be two (B, C level) for the protection of segregation. B-mine use is generally greater flow capacity of the mine installations, the Lightning could be more casual Liuxie people, to achieve the objective of current

limit, over-voltage at the same time will reduce to a certain extent, c-mine use With lower residual pressure of the mine installations, you can loop in the remaining scattered lightning Liuxie people, to limit the purpose of over-voltage, over-voltage equipment can be reduced to the level of tolerance.

The main power supply system is inhibited lightning protection and operation of the power back to the road and over-voltage surge. According to the substation status of the substation of the second mine-sensing system and the operation and use of two over-voltage protection. As build more substations in the region more open, relatively strong electromagnetic strength, power lines and communication cables are very vulnerable to lightning attacks sensors, sensors along the over-voltage power lines and communication lines into one device, which will damage equipment,

Therefore, the exchange of first-class bus to install the power protection (B level) is to ensure the safety of the entire control room, and 80 percent of the over-voltage China, scattered to the earth, play a primary role in the protection, but are still in the exchange of feeder Some of the B-level power supply voltage and mine the residual pressure increases on-line and must therefore be important in the exchange of feeder lines (DC charging screen, UPS, etc.) c-level power protection, which would curb over-voltage electrical equipment to back-end To the level of tolerance.

Protective location: It is 1 EC1312 (LEMP protection \les. Arrester installation should be in different locations at the junction of protected areas, this network, the first-class protection should be located in the bus exchange. In Two on the bus with the installation of a B-class models of a three-phase power supply voltage surge protector. Install Location: AC bus (cabinet).

3.2 second-class protection measures to deal with

charge screen, the installation of c-level three-phase power arrester. As DC charging screen is two-way exchange of electricity supply, so the screen in the DC charge with the installation of two models of c-level three-phase power supply over-voltage surge protector. Installation location should choose the DC charge screen open exchange of air power. 3.3 integrated automation system over-voltage protection

Protective position: Computer-based integrated automation system's ability to bear a very low voltage, several hundred volts of over-voltage is enough to damage the equipment, so must the high side arrester the residual pressure (thousands of volts) to further curb to meet equipment Insulation level of need, and because of the potential rise to power and the induction loop is also over-voltage line up on KV, to be used in the exchange of integrated automation system to the exchange on the

c-level single-phase installation of a surge Voltage protection. Location should choose to install automated-ping in the Composite Air switch the AC power.

3.4 did not ask off power supplies (UPS) over-voltage protection

Protection here: because of the internal computer systems, hubs, monitoring equipment, electric energy billing systems and so on through the UPS power supply protection, in order to protect the safety of these micro-electronics equipment, the UPS power supply device in front of the installation of a c-Surge Voltage protection. Optional models: The (UPS for single-phase power input) C-class single-phase power surge or over-voltage protection (UPS for the three-phase power input) of c-level three-phase power supply over-voltage surge protector. Installation should choose the location of UPS into the front line.

3.5 communication interface over-voltage protection

Communication Interface over-voltage protection compared with the grid supply system, this over-voltage circuit on the degree of sensitivity is much higher, and these are over-voltage equipment in the circumstances it is very fragile. Equipment insulation tolerance level is very low. With the equipment connected to a signal line, data lines, measurement and control lines, and these are basically in line LPZOB region, but also through the LVZOA region, on the lines of sensors over-voltage relatively strong, according to the IEC test, when the electromagnetic field Strength increased to 0.07 GS, will have a micro-computer equipment malfunction, loss of data. And the safety of these circuits is directly related to a system of safety equipment, so important to be on the interface circuit over-voltage protection.

3.5.1 remote computer interface devices over-voltage protection

Protective position: As substation computer remote installations scattered distribution structure. From remote modules, intelligent telemetry module, intelligent

remote control module, intelligent remote-module. The modules are installed in different automated-ping, through the RS232 interface between the modules or field bus communication. These interfaces are in the indoor circuit, equipment interface circuits shorter the distance, so there will be no more sensors to the over-voltage, but the automation equipment and other secondary equipment (measurement unit, computer, etc.) have electrical connections, when Other secondary equipment sensors to a strong over-voltage sensors, will be counter to these automation equipment, communications interface, so that damage to equipment interface circuits, it is necessary in these devices RS232 interfaces on the installation of a surge Voltage protection. Installation location should choose