内容发布更新时间 : 2024/11/13 14:49:24星期一 下面是文章的全部内容请认真阅读。
***建设项目
施 工 组 织 设 计
*** ****
目 录
第一章 编制依据与目的 ················ 7 1.1 编制依据 ···················· 7 1.2 编制目的 ···················· 7 1.3 招标范围 ···················· 7 1.4 采用的规范 ··················· 8 1.5 其它 ······················ 10 第二章 总体概述(总体认识,总体组织,总体设计,总体计划,综合措施) ························ 11
2.1 总体概况 ···················· 11 2.2 项目管理主要目标 ················ 22 2.3 施工组织 ···················· 24 2.4 施工程序与主要施工方案的选择 ·········· 27 第三章 机械设备投入、进场计划及保证措施 ······· 30 3.1 机械设备投入计划及布置 ············· 30 3.2 保证措施 ···················· 31 第四章 施工平面布置和临时设施布置 ·········· 34 4.1布置原则 ····················· 34 4.2 布置依据 ···················· 35 4.3 施工现场总平面布置 ··············· 35 第五章 安全生产和文明施工措施与承诺 ········· 43 5.1 施工现场安全生产 ················ 43 5.2 施工现场文明施工、环境保护措施 ········· 61
5.3 安全生产、文明施工图例 ············· 68 5.4 违约承诺 ···················· 72 第六章 质量保证措施与承诺 ·············· 73 6.1 质量管理目标 ·················· 73 6.2 质量控制保证体系 ················ 74 6.3 质量管理方法 ·················· 76 6.4 保证工程质量主要措施 ·············· 77 6.5 原材料质量保证措施 ··············· 78 6.6 为确保质量所采取的检测试验手段及措施 ······ 79 6.7 技术保证措施 ·················· 81 6.8 施工期间对隐蔽工程的质量保证措施 ········ 83 6.9 主体施工过程中的质量控制 ············ 85 6.10 违约承诺 ···················· 88 第七章 施工方法及技术措施 ·············· 90 7.1 工程测量定位放线 ················ 90 7.2 基础土方工程及降排水措施 ············ 96 7.3、基础土方回填 ················· 103 7.5地下室复合防水 ················· 114 7.6模板工程 ···················· 118 7.7 混凝土工程 ·················· 125 7.8 砌筑工程 ··················· 136 7.9 外墙保温工程施工 ··············· 139 7.10 屋面工程 ··················· 148