挡土墙工程
施工组织设计
编制日期
构思新颖,品质一流,适合各个领域,谢谢采纳
目 录
一、 编制说明········································ 二、 编制依据及原则··································
2.1编制依据····································· 2.2编制原则····································· 三、工程管理目标····································· 四、工程概况·········································
4.1工程地理位置································· 4.2施工场地周围环境····························· 4.3工程范围及规模······························· 4.4工程主要特点································· 五、设备、人员动员周期及材料组织供应··················
5.1人员、设备动员周期···························· 5.2技术准备······································ 5.3材料组织供应·································· 六、施工准备及临时设施······························· 6.1临时房屋设施·································· 6.2水、电设施···································· 七、 施工组织机构的建立·······························
7.1 组织机构设置································· 7.2施工组织管理机构的运作························
构思新颖,品质一流,适合各个领域,谢谢采纳
八、施工计划··········································
8.1 工期进度计划································· 8.2 施工设备计划································· 8.3 各施工队伍人员构成··························· 8.4 材料供应计划及措施··························· 九、施工方法··········································
9.1挡土墙构造···································· 9.2填土施工要求·································· 9.3衡重式挡土墙施工······························ 9. 4重力式挡土墙施工······························ 十、工程质量保证措施···································
10.1技术保证措施································· 10.2质量管理措施································· 10.3施工组织措施································· 十一、安全保证措施:···································· 11.1安全施工主要措施·····························
11.2安全保证体系································· 十二、文明施工,加强环保······························
12.1文明施工····································· 12.2施工现场环境保护···························· 12.3绿化工作措施································· 十三、施工进度保证措施:································