武汉理工大学课程设计

2 1 11.000 20.244 10.689 0.311 2 2 21.000 20.637 20.472 0.528 2 3 28.000 21.030 27.928 0.072 2 4 24.000 21.423 24.679 0.679 3 1 12.000 21.816 11.519 0.481 3 2 22.000 22.209 22.031 0.031 3 3 30.000 22.602 30.015 0.015 3 4 26.000 22.995 26.490 0.490 -------------------------------------------------------------------

DEMAND CONFIDENCE INTERVAL ( 90%)

YEAR SEASON FORECAST LOWER BOUND UPPER BOUND

4 1 12.349 11.821 12.876 4 2 23.591 22.599 24.582 4 3 32.103 30.776 33.430 4 4 28.301 27.150 29.452

REGRESSION EQUATION: Y = a + bX WHERE: Y = DEMAND X = TIME PERIOD a = 18.2789 b = 0.3930

5

FORECAST = Y * SEASONAL INDEX (i) R = 0.938

R-SQUARE = 0.8789

MEAN ABSOLUTE DEVIATION (MAD) FOR THE LAST 3 PERIODS = 0.179

MEAN SQUARED ERROR (MSE) FOR ALL PAST PERIODS = 0.234

MEAN ERROR (bias) FOR ALL PAST PERIODS = -0.108

STANDARD ERROR (sigmasubyx) IS = 0.5515

SEASONAL INDEX (1) = 0.528 SEASONAL INDEX (2) = 0.992 SEASONAL INDEX (3) = 1.328 SEASONAL INDEX (4) = 1.152

所以,第四年的需求预测为:

武汉理工大学课程设计

Year 4

13 24 33 28 图2.2

第三章 生产工艺路线与生产方式

3.1 生产工艺路线

7

零件编号123456789201316212310121415171819112224252627零件名称上模座凹模螺钉1凸凹模垫板圆锥销挡料板模柄拉杆螺钉2固定卸料板导套止动销挡料销凸模压边圈垫块导柱下模座顶杆定位销螺钉螺母推板上模组合下模组合模具总装1车削磨削磨削车削车削车削车削铣削车削零件车削铣削铣削车削磨削车削生产工艺23钻孔扩孔钻孔扩孔标准件,直接购买钻孔扩孔钻孔攻螺纹标准件,直接购买钻孔攻螺纹钻孔攻螺纹钻孔攻螺纹标准件,直接购买钻孔攻螺纹钻孔热处理标准件,直接购买标准件,直接购买钻孔攻螺纹钻孔攻螺纹磨削热处理钻孔攻螺纹攻螺纹标准件,直接购买标准件,直接购买标准件,直接购买热处理连接、粘接连接、粘接4攻螺纹攻螺纹攻螺纹热处理铣削部装总装提前期(周)221211111111111111111111112总装比部装复杂,故提前期较部装长 图 3.1

3.2 生产方式选择

机加工能力:13050 h / 450 h = 29

装配能力:4200 h /150 h = 28

所以,此工厂最大生产能力为 28,即若采用市场匹配生产方式,则第三个月会超过工厂生产能力,需采用外协或加班生产方式,

3.2.1 均衡生产与市场匹配生产的比较